STEP 4: Detait RxLabilitatioH Design smd Construction
Dcsign the rehabilitation alternative: perform the detailod design and develop the required plans specifications and estimates.
STEP 5: Monitor Pavement Performance
Make follow-up reviews of pavement performance: this is essential so that deficiencies can be
corrected in the next 4R design project.
The following will dcmonsirate the procedure for highway pavement rehabilitation based on one case study.
STEP 4: Detait RxLabilitatioH Design smd Construction
Dcsign the rehabilitation alternative: perform the detailod design and develop the required plans,specifications and estimates.
STEP 5: Monitor Pavement Performance
Make follow-up reviews of pavement performance: this is essential so that deficiencies can be
corrected in the next 4R design project .The following will dcmonsirate the procedure for highway pavement rehabilitation based on one case study.