数米中查询我的基金:毕业摘要求助~帮忙翻译成英语~先谢了

来源:百度文库 编辑:查人人中国名人网 时间:2024/05/09 19:27:38
实在没办法~~只有寻求社会的帮助拉~
摘要
本次设计任务是浙江地区某二级公路,经过地区主要为山岭重丘区,全长2703m ,设计时速为60km/h .路面宽7米,路基宽10米,路面两侧为0.75米的土路肩。面层为沥青混凝土,基层为石灰粉煤灰碎石,底基层为石灰土。所要完成的设计有:确定公路等级、选择路线的线形、平曲线要素计算、绘制路线纵断面图、竖曲线要素计算、绘制路线典型横断面图、做土石方调配、路线超高计算、设计路面结构、路面防护工程设计、路基排水设计、路线的视距检查、工程预算。并设计简支桥梁一座,为4跨20米钢筋混凝土T型梁桥,行车道 ,人行道 。
鉴于本人水平有限,设计中的错误和遗漏之处敬请各位老师予以批评指正。
关键词 道路等级;平曲线;竖曲线;排水;路基;沥青路面;梁桥;
头疼~~各位大哥先谢谢了`这个是毕业用的~不能拿在线翻译的开玩笑啊!

Summary
This time designs the mission is some second class highway in region of Zhejiang, is mainly heavy area of of mountain range through region, whole long 2703 ms, design hour soon is 60 kms/ h.The road faces 7 meters of breadth,10 meters of the roadbed breadth, the road faces two sides as the soil shoulders of 0.75 meters.Face the layer as bituminous concrete, the basic level is the lime powder ash from stove crushed stones, the bottom basic level is lime soil.Want that the finished design have:Certain highway grade, choose the line form, the even curve main factor calculation of the route, draw the route vertical section diagram, the curve main factor calculation, draw the route typical model cross section diagram and do the ground square dispensation, extremely high calculation of route, design the road to face the structure, road to face the protection engineering design, roadbed to drain design, the route sees to be apart from the check, engineering budget.Design an of JIAN3 ZHI's bridge also, for 4 across 20 meters reinforced concrete T type beam bridge, go the driveway, sidewalk.
Owing to oneself the level is limited, a please each teacher of the mistake and the lapse in the design gives the animadversion to correct.
Keyword road grade;Even curve;Curve of ;Drain;Roadbed;Asphalt road noodles;Beam bridge

Abstract
This design task is a secondary road Zhejiang region, the main areas for mountain after heavy Confucius area that stands 2703m design at speeds 60km/h. 7 metres wide road, roadbed width of 10 metres, 0.75 metres of dirt roads on both sides of shoulders. For the asphalt concrete surface, the grass-roots to lime Fenmeihui gravel, the grass-roots to lime territories. To be completed design : identifying road grading, selection line graph, Ping curve elements calculation, mapping routes vertical section maps, vertical curve elements calculation, mapping routes typical cross maps, earth and stone to deploy, extremely calculating routes, road design structures, road protection engineering, roadbed drainage design, the visual line inspection, engineering budget. And the design of the bridge a short extension to four inter-20 metres of reinforced concrete t-Liang Bridge carriageway sidewalks. Since I limited ability, design errors and omissions if you teacher criticized me.
Keywords: road grading; Ping curve; Vertical curve; Drainage; Roadbed; Asphalt; Liang Bridge;