远东宏信股权结构:翻译协议一分,共赏30(2)

来源:百度文库 编辑:查人人中国名人网 时间:2024/04/28 15:24:24
3
2.4 BARCODE
*****, member of EAN international, provide barcode for all the products develop only for RTMART.
For standard products, Supplier is using his own barcode as usual.
If the barcode is stuck on the product, only anti-tear barcode will be authorized. Otherwise, the goods
will be refused during inspection.
2.5 RECYCLE FEE
Supplier must also send to ***** all information pertaining to every element of packaging
(description, net container weight, size, volume) so as to enable us to comply with Tailand Environment
law and pay the relevant contribution fees towards recycling.
3. QUALITY APPROVAL:
3.1 DOCUMENTS:
After received ***** order, you must provide:
1. Certificate of analysis(CA) of the product from yourself or international testing company.
2. Composition and finishing of the product:
All these details of the requests will be report on a “ Technical specifications sheet”
3.2 CONFORMITY SAMPLE:
CONFORMITY SAMPLE should be exactly the same as mass production.
If for technical reasons, CS is not available before production, Supplier will send a prototype along with
all the necessary explanation.
3.3 INSPECTION & LAB TESTS:
All goods have to be inspected before shipment, by the inspection company or any representative of RTMART
as mentioned in the order.
For inspection, 100% of the goods should be finish & at least 80% should be already packed.
***** pays for the first inspection. Should it fail because the goods do not meet the quality
required, re-inspection will be paid directly by Supplier to Inspection Company. If Supplier failed
for payment, ***** will deduct the unpaid inspection fee from the payment.
PROCEDURE :
Supplier has to send two conformity samples with final packaging corresponding to ***** ‘s order:
One directly to inspection company & One directly to ***** before production.
The conformity samples send to local inspection company and ***** should be exactly the same.
After the conformity sample being agreed and approved by ***** quality control dept, Supplier can
start the production.
In case of LAB TESTS, at the time of inspection, the inspection company will pick up some samples,
stick them and the supplier will immediately send them to the laboratory for lab testing the conformity
of the goods issued from the production for *****. For accredited Suppliers, internal supplier’s
laboratory could be allowed to make the lab test.

3
2.4 BARCODE
*****, EAN 的成员国际, 为所有产品提供barcode 显现出只为RTMART 。
为标准产品, 供应商使用他自己的barcode 和平常一样。
如果barcode 是陷进在产品, 只反撕毁barcode 将被批准。 否则, 物品
将被拒绝在检查期间。
2.5 回收费
供应商必须并且寄发到***** 所有信息附属对每个包装的元素
(描述, 净容器重量, 大小, 容量) 以便使我们依从Tailand 环境
法律和支付相关的贡献费往回收。
3. 质量认同:
3.1 文件:
在被接受的***** 订单以后, 您必须提供:
1. 证明analysis(CA) 产品从你自己或国际测试的公司。
2. 产品的构成和精整:
请求的所有这些细节将是报告关于"技术规格板料"
3.2 整合样品:
整合样品应该确切地是相同象大量生产。
如果为技术原因, CS 不是可利用的在生产之前, 供应商将送一个原型与一起
所有必要的解释。
3.3 检查& 实验室试验:
所有物品必须被检查在发货之前, 由检查公司或RTMART 任何代表
依照被提及在次序。
为检查, 100% 物品应该是结束& 至少80% 应该已经被包装。
***** 支付第一检查。 如果它失败因为物品不遇见质量
必需, re 检查直接地将由Supplier 支付对Inspection Company 。 如果供应商失败了
为付款, ***** 从付款将扣除未付的检查费。
做法:
供应商必须送二个整合样品以决赛包装的对应于***** ` s 次序:
一直接地对检查公司& 一个直接地对***** 在生产之前。
整合样品送到地方检查公司并且***** 应该确切地是相同。
在整合样品以后被***** 质量管理部门同意和批准, 供应商能
开始生产。
在实验室试验的情况下, 在检查之时, 检查公司将拾起一些样品,
黏附他们并且供应商立刻将寄发他们到实验室为实验室试验整合
物品发布了从生产为*****. 为被检定的供应商, 内部供应商的
实验室能允许做实验室试验。